We move your self-hosted purchase to managed cloud infrastructure, without the downtime or data-loss risk of doing it yourself.
$5,500
Scoped to your specific engagement
Self-hosting gives you control but adds operational burden. Cloud Migration moves your purchased platform onto managed cloud infrastructure — AWS, GCP, or Azure — with a documented, tested migration path and minimal downtime.
What to expect — typical ranges, not guarantees
2–3 wks
Typical migration timeline
<30 min
Target planned cutover downtime
3
Cloud providers supported (AWS/GCP/Azure)
100%
Data integrity checks throughout
Review your current self-hosted setup and target cloud environment requirements.
Build a migration plan with a defined rollback path in case anything goes wrong.
Execute the migration in a scheduled window, with data integrity checks throughout.
Confirm the migrated environment matches expected performance and functionality.
Cloud Infrastructure Engineer
Designs and executes the target environment
DevOps Engineer
Builds the migration and rollback tooling
Security Reviewer
Confirms the new environment meets your compliance bar
| Model | Scope | Timeline | Price |
|---|---|---|---|
| Fixed-scope migration | Single environment, defined cutover window | 2–3 weeks | $5,500+ |
| Managed infrastructure retainer | Ongoing cloud operations after migration | Monthly | $1,800/mo+ |
Stack18's services practice is new — the scenarios below illustrate how an engagement like this typically plays out, not verified past-client results.
Illustrative scenario
Self-hosted to AWS migration
Hiring platform operator
Migrated a self-hosted hiring platform to AWS with a tightly bounded planned downtime window and zero data loss.
Illustrative scenario
Multi-cloud redundancy setup
Healthcare interoperability platform
Moved to a redundant multi-cloud configuration, materially improving measured uptime since cutover.
Engagement
Fixed-scope project
Priced per environment complexity
Starting at
$5,500
Standard single-environment migration
Timeline
2–3 weeks
Includes a scheduled cutover window
Final pricing depends on scope confirmed during a consultation — the figures above reflect typical starting points, not a fixed quote.
We plan for minimal downtime and always define a rollback path before the cutover window.
AWS, GCP, and Azure are all supported, based on your existing preferences or requirements.
Every migration plan includes a tested rollback path defined before the cutover window even begins.
Both — database migration with integrity verification is a core part of the engagement, not an add-on.
Yes, cloud-to-cloud migrations follow the same assess-plan-migrate-verify process.
Near-zero downtime is achievable for most architectures with the right cutover strategy; we'll tell you upfront if yours needs a maintenance window.
Book a free consultation — no commitment, just a clear plan and a real quote.
Book a free consultation